David Jones

Project details

We were contracted to undertake the grinding and resurfacing of the existing floors of the Kirkcaldie & Stains heritage building as it became New Zealand’s first David Jones department store. The team was required to grind and resurface approximately 5000sqm of floor space, requiring more than 3000 bags of engineered cement leveling compounds.

All finishes were delivered within standard or better tolerance levels for the respective floor coverings.

Visit David Jones and see for yourself. The finished result speaks for itself.